Are you leaving money on the table? I know that initially, when I started the business, I left loads of money on the table. It was basically about doing the job you're asked to do, packing up your tools, and moving on to the next job.
It's very silly because the amount of money that it costs for me to acquire that client. I could have maximized that job rather than going back to the drawing board, pumping more money into marketing, more money into ad spend on Facebook, Google ads, etc. And then having to do the exact same thing over and over.
When I first started the business, and I think this is the mindset of many business owners when they first start, it's a very poverty mindset where you think you're doing a disservice to the client by flagging something, showing a safety issue, fear of another invoice going to be too big. You start comparing what you're initially taking as a salary from your business when you start out versus what their salary is.
And is it going to be okay to suggest doing this or suggest doing that? Where if you don't ask, you don't get. And I think that goes for a lot of things in life. If you do not ask that question, the worst thing they can do is say no.
A large chunk of our profit in the business now comes from upsells and cross-sells, be it before the job or after the job. It's crazy. What a difference it has made. Just suggesting these things to clients, and the clients are really appreciative that you've pointed that out. And they go ahead with it.
Just to put it into perspective, I'll always come back to electrical since it's our core business. So what we generally excel in is the likes of maintenance items and safety items.
So smoke alarms and safety switches. But you take, for instance, just those two items. With smoke alarms, they've got to replace every 10 years, not just the battery. The units themselves have to get replaced. We stumbled across a lot of expired units. And to be honest, if you check the fine print in the insurance policy, there are mentions of the smoke alarms along with wiring as well. So for the smoke alarm, we can get the smoke alarm for approximately $40 at cost for a decent unit. Now, we would charge in the vicinity of $150, $160 plus GST to swap it over. That swap over would take us all of, if you've got to go through the truck and pick it up and come back in, set your ladder up drop sheet, etc. Probably 15 minutes going bad.
So in that time, what have we made? Over a hundred dollars in 15 minutes, and there could be two or three smoke alarms in the house. So you put that into the equation of your job has initially, let's say it's a $500 job. You're going out there for. There are three additional smoke alarms on that job?
No, you've profited an extra $300 off of that job. Let's just say it's $140 for the swap over. So it's a clean 100 off of that. That's $300 in the space of 45 minutes. This is where people leave money on the table. Instead of rushing through the job, packing up the tools, and moving on to the next one, it's more beneficial to complete as much as you can on the current job. Ensure the client is happy to proceed, and it's not necessarily about finishing it all in one day.
If you do a safety inspection, you can pick out items that you can say, look. This should be done. This is vital to do, and this is optional. If you would like to do this, you can pick out separate items.
There are a few ways to relay these upsells across those, whatever you want to call them. Safety cells. And that is, you can either do it in the quoting process. When we look at pitches, we usually point out stuff like safety switches beforehand.
We can say them before the job. Let's say hypothetically, they've got two circuits that are not protected by a safety switch. We will then relay to them that is substandard. And if you wish to replace it, it's going to cost X amount. Some people approve it before the job is even started. So then that's additional profit on the job.
One thing I will say is to be careful if you're relaying all this stuff before the job has started, some clients can get overwhelmed and then think you're actually charging way too much. And then go to another quote. So it's a lot like poker. I don't know if you play poker. I'm not that great at poker, but I'll give it a go.
So you don't want to lay all your cards out at once. Similarly, you don't want to lay all your cards on the table.
If you spot some issues, perhaps pick one or two items to discuss at the beginning. Then, when you get to the job, you can relay the rest of the information.
When you have the job locked in is one of the best times to pick up on these little items. Something that we do with some of our EV installs is we'll wait until the job is locked in.
Then the following day or a day before the install, we'll send an email just regarding a surge protection device. And I would say about 80% of people go ahead with the surge protection device. What we found is when we put all our cards on the table on gave all the advice of, we reckon you should install the surge protector as well. What we believe was happening was we'd give her a quote and then an optional quote with the surge protector. They would in price check with other competitors, they would drop their pants and basically throw in the surge protector for free to get the job.
And we were losing the job. So now we wait until that job was locked in and then we will add the surge protection.
As I spoke about in the past on other podcasts, there's always a safety check that you can do this favor. Some trades like your plumbers and electricians, particularly nobody wants boss pipes or boss holes in their house, leaking all over the place.
Likewise with electricity, there's a lot of things that could be picked up. Like safety switches are electrodes surge protection and so on. So obviously those trades get the upper hand in regards to safety inspections. However, if you are in another trade, even like a carpenter, if you're on the job and you're installing a custom wardrobe, why not ask, would they consider doing a little inbuilt offers into this nook?
Do they want other cabinetry done and the host, the kitchen, etc.? If you don't ask, you don't get again. If you're a landscaper, even with cross-selling with landscaping or a gardener. Do you want to book in one month's time or two weeks' time again? We've got a slot available. Do you want to book into that mechanics?