If you're not an electrician and you receive a quote in your email for a cooktop installation at your home, and it goes something along the lines of: "Install CCT on dedicated RCBO with 6mm cable for 32A. CT installed in kitchen," does that make sense to you? We're going to talk about simplifying quotes so they're understandable to anyone you give them to.
What that blurb was about is for a cooktop installation, and I'm going to break that down. So, "install a CCT" means setting up a circuit, in electrician's shorthand, on a dedicated RCBO (Residual-Current Circuit Breaker with Overcurrent protection). That's with a 6mm cable for a 32A (ampere) circuit. CT installed.
If you're putting that kind of language into quotes, you're probably starting to lose out on potential jobs due to this jargon. What you need to do is really simplify your quotes, consider the 'mom test,' as if you're explaining it to your mother. To phrase that better, it would be "Install a new power circuit from the main switchboard using a heavy gauge 6mm cable for a 32 amp circuit for an induction cooktop in the kitchen." This language is much easier to understand. I've also added some descriptive language by mentioning "heavy gauge 6mm cable." That might seem like a 'monster' of a cable, but 'heavy gauge' simply refers to a larger diameter than the average 2.5mm or 1.5mm cables used in sockets.
When you're doing quotes, you really want to simplify everything. We even put brackets after some things that may seem confusing. So, for example, if I was to say "Install a 2G (two-gang) switch," where 'gang' refers to the number of switch controls on a single plate. If I'm putting out a quote and it's going to say "Install a replace 3-gang switch," after the word 'gang,' I will put (number of switches) in brackets. Therefore, it removes any confusion in the quoting process.
And when they see it, they know exactly what they're getting. And as well with safety switches and RCDs, these technical terms, to electricians are very commonly used, you know exactly what it is. But if I was to walk up to a random person on the street and ask, "Do you know what an RCD is?" Chances are, they're not going to know what that is. And this is across the board in your marketing as well.
We've just had the website rebuilt. And I spent the most time on the area 'above the fold.' So once the actual page loads, the immediate thing that you see, that's where the attention span is going to go to and where you're going to either win or lose the clients. When they look at that page, they need to know who you are, what you do, and how you can serve them best. And this comes across in your quotes as well; there's no point in having a fancy website that leads to getting inquiries, but then you complicate things by using jargon in your quotes.
So, you're winning; you're getting leads in. You start to drop the ball by not simplifying the quotes, making it very easy for the client to understand what they are getting. Again, remove the friction; click here to accept the quote, just make it so easy for them to accept that you're getting those jobs in the door. The second part to this is painting a picture or fluffing out the quotes to show more value. Let's say, for instance, again, obviously I'm biased with electrician stuff because I'm an electrician. But if you're doing a job and let's say, for instance, this is a very common one where we go fault-finding and there's an issue with the power circuit.
There's a damaged cable, there's water in a light fitting or something. A common mistake some make, especially when working for real estate companies like 'Astrada' (which we don't), they complete the job and then go home. They've sent the invoice and it just says "electrical fault-finding $600." The client's jaw will drop, wondering, "What the hell am I paying for?"
But if you had phrased that blurb to something like "Attend property for fault-finding on tripping light circuit, removed switchboard cover, from circuit disconnected cables from top of RCD (safety switch), performed an insulation resistance test on the cabling leading to the light circuit, low reading of 0.01 megaohms found (indicating a fault on the circuit), disconnected circuit at midway points, found it to be at the rear of the house, disconnected light fittings, light fitting full of water found at left rear
of house, emptied water, dried it out, replaced fitting, whatever, put it back up, put the circuit back together, put the light fitting back up, put the cover back on the switchboard."
Obviously, I'm expanding on this for clarity. But if you had received that invoice with all of that description versus one sentence, you're justifying the value of your invoice. So let's go back to quotes. Again, you can make this extremely easy with your quoting software. So again, reverting back to job management systems. We rave about templates all the time because it makes our quoting process so easy. How we lay it out is, for instance, with the cooktop above, it's a 6mm socket.
So we would have, we might have an EV charger and we might have a cooktop under the 6mm category. You can have that blurb made out like "Install 6mm socket for [X]," and we'll have an X where we fill in what it's for, and it will say "Run cable from switchboard to [X], via isolator or whatever. Wherever there's an X.
All we have to do when we load up the quote is go into it, click where the X is, replace it with 'cooktop,' replace with 'EV charger.' You can even go one step better and create a prebuilt for each, which is fantastic. All this can be done. All this can be streamlined in your job management software, and it just makes your life easy, and it makes the client's life easy, that they know exactly what they're getting.
Have a look at how you're sending out quotes and how you can improve it. Because if you make these little tweaks, dumb everything down, I guarantee your quote conversion will improve dramatically.